Construction Health & Safety Software NZ

Construction health & safety software that organises your whole site

SiteConnect is construction health & safety software built for NZ sites, bringing your entire health and safety process into one organised system, from SWMS to the final audit report.

14 day free trial. No credit card. No contractor licence fees.

SiteConnect construction safety software dashboard showing site reporting for NZ construction sites

Where does your safety information live right now?

If the honest answer is "everywhere", you are not alone. Most NZ construction teams run safety across four or five disconnected places, which means hours lost hunting for the right document and important details quietly slipping through the cracks.

The site cabin folderSWMS printed three revisions ago, signed by half the team.

The group chatHazard photos buried under 400 messages in the site group chat.

Someone's inboxThe only copy of the contractor's insurance, somewhere in Sent Items.

The paper sign-in sheetRained on twice, coffee once, and nobody can read row nine.

One system for your whole health and safety process

Safety on a construction site is not a pile of documents. It is a process that runs from pre-construction planning through to proving compliance. Our construction safety software organises every stage of it in one place.

1 Plan

Set every project up on solid ground

Build your SSSP, risk registers and SWMS before boots hit the site. Start from proven templates, tailor them to each trade and task, and keep every revision version controlled so the current plan is the only plan anyone sees.

SWMS and risk register in SiteConnect construction safety software
2 Induct

Get everyone on site properly, the first time

Run site inductions from a phone, sign visitors and contractors in with geofencing, QR codes or a kiosk, and check competencies and documentation before anyone picks up a tool. Contractors connect free, so there is no awkward conversation about licence fees.

Site induction and contractor management in SiteConnect
3 Work

Keep daily safety running without chasing paper

Toolbox talks scheduled and recorded with digital signatures. Pre-start checklists completed on phones and tablets right there on site. Digital forms for permits, inspections and everything in between, all landing in one place instead of the ute dashboard.

Inspections and digital forms in SiteConnect construction safety software
4 Respond

When something happens, act in minutes

Workers report hazards, near misses and incidents in seconds with photos and location attached. Custom workflows notify the right people automatically, investigations are tracked to close-out, and nothing gets quietly forgotten in a drawer. Export WorkSafe notification-ready reports.

Incident reporting workflow in SiteConnect construction safety software
5 Prove

Show your working, any day of the week

Every induction, talk, inspection and incident is time stamped and stored. When a client, lead contractor or WorkSafe inspector asks how you manage safety, you export the evidence in minutes instead of reconstructing it over a weekend.

Exporting a hazards and risks register PDF from SiteConnect for audits and WorkSafe evidence

Built around how NZ construction actually works

Under HSWA 2015, every PCBU sharing a site has overlapping duties, and a legal obligation to consult, cooperate and coordinate with everyone else who shares them. SiteConnect gives each PCBU an organised way to plan, manage and monitor health and safety, so the paper trail exists because the work happened, not the other way round.

And because everything lives in one system, handing information between PCBUs stops being a box of folders and starts being a login.

See it on your project

Principal contractors

Coordinate overlapping duties across every PCBU on site with a live SSSP, site rules, inductions and real-time visibility of every contractor on site.

Contractors and subcontractors

Receive site-specific SWMS and inductions on your phone, sign digitally, and keep your own compliance records without paying for a licence.

Site managers and supervisors

Run daily briefings, pre-start checks and inspections from the tools you already carry, with everything recorded automatically.

Why NZ construction companies choose SiteConnect

Cut admin time by up to 75%

Automated forms, reminders and reports give your team their afternoons back. Build things, not filing systems.

See every site in real time

Who is signed in, what is overdue and what happened this morning, across all your projects, from one dashboard instead of five phone calls.

A complete end to end system

From the first SSSP to the final audit report, every stage of your safety process lives in one place. No bolt-ons, no spreadsheets filling the gaps.

Case Study

How Universal Homes organised safety across every site and achieved ISO 45001

70

Contractors active on site daily

20

Site inductions completed daily

ISO 45001

Certification achieved in 2025

“

SiteConnect has given us realtime visibility across all sites and played a major role in helping us achieve ISO 45001. It's easy for frontline teams and powerful for back-end administration, something most systems get wrong.

Tony Putter, Health & Safety Manager, Universal Homes

Frequently asked questions

Construction safety software brings your health and safety processes, such as SSSPs, SWMS, site inductions, toolbox talks, inspections and incident reporting, into one digital system. Instead of paper folders and spreadsheets, everything is created, signed and stored in one organised place, accessible from site on a phone or from the office on a browser.

SiteConnect digitises the core duties every PCBU carries under the Health and Safety at Work Act 2015, including SSSPs, SWMS, site inductions, and records of how health and safety is planned, managed and monitored during the construction phase. When multiple PCBUs share a site, SiteConnect also gives everyone the same live picture, which makes it easier to meet the HSWA duty to consult, cooperate and coordinate. Everything is time stamped and exportable, so evidencing compliance takes minutes rather than days.

No. Contractors and subcontractors connect to your sites free of charge. You only pay for your own team, which makes SiteConnect particularly cost effective for principal contractors managing a rotating cast of trades.

Your team on site uses the SiteConnect mobile app on iOS and Android phones and tablets, visitors can sign in via QR code, geofencing or a tablet kiosk, and the office manages everything from a standard web browser. There is no special hardware to buy.

Yes. You can build your existing SWMS, checklists and forms into SiteConnect as reusable digital templates, or start from our pre-built library and tailor it to each trade and task. Version control keeps everyone working from the current approved document.

Most NZ construction teams are up and running within days, not months. Projects and sites are configured first, then users and contractors are invited with one-click invites, and site-specific SWMS and inductions are assigned in minutes. Our NZ support team helps you through setup.

Get your health and safety out of the filing cabinet

See how SiteConnect organises your whole safety process, from the first SSSP to the final audit report.

Book a demo

14 day free trial available. No credit card needed.